LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind turbine construction slows 

Credit:  Valley News | August 17, 2013 | www.vnews.com ~~

Things are looking up. There is a major slowdown in wind turbine construction all over the U.S.

In the first quarter of 2013, only 1.6 megawatts of wind turbine capacity was built and in the second quarter, zero was built. The main reason is the expiration of the Section 1603-c program at the end of 2012, which gave federal cash grants of about 30 percent of the project capital cost to wind turbine project developers.

This infusion of cash grants to Big Wind under the American Recovery and Reinvestment Act of 2009 changed the economics of the industry overnight. Projects that made no economic sense became viable with the cash grant (Lowell Mountain, etc.) In many cases, applications were rushed to take advantage of the cash grants before deadlines. The industry’s project pipeline was emptied, rushed to approval and built by the end of 2012.

During the cash grant program period, about 30,000 megawatts of new wind turbine capacity was built, more than doubling U.S. wind turbine capacity. The U.S. had never experienced that rate of growth with just the production tax credit (PTC).

With domestic, abundant, low-CO2 emitting (compared with coal), no-particulate emitting, low-cost natural gas , and continued flat demand for electricity, it’s no surprise the cash-grant-induced wind turbine bubble collapsed and will likely push installations back to mid-2000s levels, or less, if the PTC is finally allowed to expire after 24 years.

If extended, the PTC, set to expire at the end of 2013, will offset above-market wholesale prices for wind energy, but will drive just moderate levels of wind turbine capacity growth.

Willem Post

Woodstock

Source:  Valley News | August 17, 2013 | www.vnews.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky