LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind farm plan lays out options 

Credit:  Suzanne Adams-Ockrassa, Miner Staff Reporter | The Kingman Daily Miner | May 28, 2013 | www.kingmandailyminer.com ~~

KINGMAN – Motorists driving U.S. 93 to Las Vegas may soon see turbines twirling on the horizon.

The Bureau of Land Management announced recently that it completed a final environmental impact statement for a 500-megawatt wind turbine farm 40 miles northwest of Kingman near White Hills.

It is unknown when construction on the project will start. Calls to BP Wind Energy were not returned before press time.

According to the EIS, construction will last for 12 to 18 months. During peak construction, the project should employ around 300 to 500 people.

The facility will have roughly 30 employees to help maintain the turbines after construction is finished. Recreational use of the land will be allowed after construction.

BP will be responsible to returning the property back to its original state after it stops using the plant.

The environmental impact statement offers four alternatives for the project.

BP Wind Energy favors Alternative A, which includes a maximum of 283 wind turbines on 47,059 acres of BLM and Bureau of Reclamation land near Lake Mead.

Each turbine would be 262 to 345 feet high.

Alternative B calls for a smaller footprint than what was proposed by BP.

It would encompass 34,720 acres of BLM land and Reclamation land and have a maximum of 208 turbines.

Alternative C would reduce the size of the project to 35,302 acres and a maximum of 208 turbines.

Alternative D calls for no action on the land. The plant would not be built.

The BLM’s preferred alternative, Alternative E, is a combination of A and B.

It would include a maximum of 243 turbines on 38,110 acres. It would also include a quarter-mile buffer zone between the plant and nearby residential land.

In addition, BP Wind Energy would be required to curtail operations at certain times within four square miles of the proposed wind farm for the protection of golden eagles.

The company has developed a conservation plan for the eagles with the Bureau of Reclamation, Arizona Game and Fish Department and the U.s. Fish and Wildlife Service.

The final EIS is currently under public review at www.blm.gov/az/st/en/prog/energy/wind/mohave.html.

Source:  Suzanne Adams-Ockrassa, Miner Staff Reporter | The Kingman Daily Miner | May 28, 2013 | www.kingmandailyminer.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky