LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind study for COMM nearing completion 

Credit:  Written by David Still II, The Barnstable Patriot, www.barnstablepatriot.com 15 July 2011 ~~

Even as a wind survey for the Centerville-Osterville-Marstons Mills water department is in its final stage, the renewable direction of the department is turning toward solar.

A wind study analyzing the feasibility of COMM’s Hayden wellfields for a single turbine is about 90 percent complete, with a sound study the remaining piece to be completed.

A 2008 preliminary survey indicated that that a single turbine of 1.5 megawatts could support all of the water department’s electricity needs, as well as those of the fire department, Water Superintendent Craig Crocker said.

Even so, the superintendent cast doubt on whether the board of water commissioners would move forward with anything at this point. Crocker said that he and the board have been watching with interest the various wind conversations and controversies across the Cape and said that his interests are turning to solar.

“I doubt they’re going to move forward with any of our money,” Crocker said.

Crocker said that the board of water commissioners heard a presentation on the results thus far at its June meeting. The $25,000 wind study was funded through a grant from the Massachusetts Technology Collaborative’s Renewable Energy Trust (RET), not from ratepayer funds.

The 2008 preliminary survey suggested that three of the district’s wellfields could support turbines of varying sizes. That report, available on the MTC website (masstech.org) concluded that the Hayden wellfields in Marstons Mills could support three 1.5 Mw turbines of nearly 400 feet in height based on land area, setbacks and aviation requirements; the Crooked Cartway wellfield north of Race Lane could support a single 100 kW turbine of 160 feet; and the Shootflying Hill Road tower could realistically support a single turbine of up to 100 kW in size, but proximity power lines and other restrictions could be problematic.

The current feasibility study is focusing only on the Hayden wellfields for a single turbine with an estimated output of 900kW.

Cape Cod Academy in Osterville also received funds for a feasibility study in the same 2009 grant round.

Source:  Written by David Still II, The Barnstable Patriot, www.barnstablepatriot.com 15 July 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky