National Wind Watch Picture Gallery

Latest additions
turbine-base-SCT.jpg
Turbine base, ScotlandWind turbine base, ScotlandAug 06, 2022
foundation-WLS-Mynydd-y-Gwrhyd.jpg
Wind turbine foundation in South WalesMynydd y Gwrhyd, Wales - photo by QuadConsultAug 03, 2022
Metsalamminkangas-FIN.jpg
Forest clearance for wind turbineMetsälamminkangas wind project in Vaala, Finland - video: https://www.youtube.com/watch?v=lT_ncyvgZb8Aug 03, 2022
Shetland-SCT-foundation.jpg
Turbine foundation in Shetland, Scotland08 Sep 2021: Viking Energy facility: first wind turbine base. Eight ready-mix lorries carried the concrete to the turbine site from two batching plants set up nearby, each of which can mix 50 cubic metres an hour. The concreting operation involved two ready-mix lorries from Garriock Bros and high-grade aggregates from the company’s quarry at Vatster. Once the concrete has cured, the base is backfilled with materials excavated from the site, leaving only the centre ring showing, ready for the turbine tower to be bolted on. - SSE RenewablesAug 03, 2022
Henvey_Inlet.jpg
Henvey InletHenvey Inlet First Nation Reserve, Ontario, Canada - 87 3.45-MW Vestas V136 wind turbines - photo from P199 via FacebookJul 27, 2022
OH-Paulding-Co-2.jpeg
Oil leak stainsStains from oil leaks on 10-year-old Vestas V100 at Timber Road facility in Spaulding Co., Ohio - photo by Ginna HinchcliffJul 26, 2022
OH-Paulding-Co-1.jpeg
Oil leak stainsStains from oil leaks on 10-year-old Vestas V100 at Timber Road facility in Spaulding Co., Ohio - photo by Ginna HinchcliffJul 26, 2022
MO-danger-wind-turbines.jpg
Danger: Wind TurbinesWarning sign at perimeter of wind energy facility in MissouriJul 26, 2022
Neumann-construction.jpg
Construction in GermanyWind turbines under construction in Germany - photo by Hinrich NeumannJun 05, 2022
Thorney-fire-4.jpg
Turbine fire in Thorney, EnglandTurbine fire - French Drove, Thorney, Cambridgeshire fens, 24 April 2022 - photo by Terry HarrisApr 25, 2022
Thorney-fire-3.jpg
Turbine fire in Thorney, EnglandTurbine fire - French Drove, Thorney, Cambridgeshire fens, 24 April 2022 - photo by Terry HarrisApr 25, 2022
Thorney-fire-2.jpg
Turbine fire in Thorney, EnglandTurbine fire - French Drove, Thorney, Cambridgeshire fens, 24 April 2022 - photo by Terry Harris via BBCApr 25, 2022
886 files on 74 page(s) 2

Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: