National Wind Watch Picture Gallery

Click to view full size image

The Terminator

Advertisement for the Tesmec 1475 trench digger ("a 100 MW wind project could have up to 150,000 feet of trenches containing 450,000 feet of underground cables" -- North American Windpower, March 2009)

File information
Filename:terminator.jpg
Album name:windros9 / Graphics
Date added:Mar 29, 2009
URL:https://wind-watch.org/pix/displayimage.php?pid=509  |  short URLs:  https://wind-watch.org/pix/509 | http://wndfo.net/P509
Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: