928 files in 2 albums with 0 comments viewed 1,192,775 times |
|
|
|
|
|
Latest additions |

Kouloubakhata (Crazy)We did it! We saved the environment! From Wind Watch GreeceDec 03, 2023
|
|

Oil leaks from 10-year-old wind turbineOil leaking from the 10-year-old Vestas wind turbines in the “Blue Creek Wind Farm” in Paulding and Van Wert Counties, OhioNov 21, 2023
|
|

Markbygden, SwedenMarkbygden, Sweden - when completed, this is to be the largest windpower facility in Europe - it is majority-owned by the Chinese power company CGN and is contracted to sell the power to Norsk Hydro in NorwayNov 17, 2023
|
|

Wind turbine foundation - Hawkesdale, AustraliaThis concrete and steel rebar foundation that will be buried forever is for one of the 23 4.2-MW wind turbines of the Hawkesdale facility near Warambool, Victoria, AustraliaNov 11, 2023
|
|
Random files |

Jiminy Peak, MassachusettsJiminy Peak, Massachusetts
|
|

Protest by Friends of Lincoln Lake at January commissioning ceremony, Stetson Mountain, MaineProtest by Friends of Lincoln Lake at January commissioning ceremony, Stetson Mountain, Maine
|
|

Mount Emerald, Queensland, Australia: time in 2022 at different output rangesSteven Nowakowski of Rainforest Reserves Australia collected 2022 5-minute output data for the 180-MW Mount Emerald wind energy facility in Queensland, Australia. The average output was 26.8% of capacity - generating at or above that rate of 48.3 MW only 40% of the time. The median output was 18.1% of capacity (meaning that half the time it was generating less than 32.6 MW.
|
|

Man and rotor blade - Twin Groves Wind Farm, McLean County, IllinoisMan and rotor blade - Twin Groves Wind Farm, McLean County, Illinois
|
|

As more wind is added to the grid, its effective capacity, or capacity credit, is progressively lowerAs more wind is added to the grid, its effective capacity, or capacity credit, is progressively lower
|
|

Soudan et Erbray, France - tower on truck negotiating turnSoudan et Erbray, France - tower on truck negotiating turn
|
|

Hoisting a tower section. Mars Hill, MaineHoisting a tower section. Mars Hill, Maine
|
|

Rotor hub on trailerRotor hub on trailer
|
|
Note: The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe
"fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to
Wind Watch via e-mail.