National Wind Watch Picture Gallery

937 files in 2 albums with 0 comments viewed 1,244,023 times
Photos


Clausnitz-2.jpg

791 files, last one added on Mar 08, 2024
Album viewed 24723 times

Graphics


Whine_turbines.png

146 files, last one added on Apr 01, 2024
Album viewed 12380 times

 

 

2 albums on 1 page(s)

Latest additions
Whine_turbines.png
Handouts foreverOver 30 years of taxpayer handouts and they still can't stand on their own - cartoon by Josh (cartoonsbyjosh.co.uk)Apr 01, 2024
Berkeley-turbines-offshore.jpg
Off-shore wind turbine sizes globally over timeOff-shore wind turbine sizes globally over time - from Berkeley National LaboratoryMar 20, 2024
Clausnitz-2.jpg
Remains of burned wind turbineBurned-out wind turbine in Clausnitz, Germany, after fire on February 26, 2024 - photo from Gegenwind ClausnitzMar 08, 2024
Clausnitz-1.jpg
Remains of burned wind turbineBurned-out wind turbine in Clausnitz, Germany, after fire on February 26, 2024 - photo from Gegenwind ClausnitzMar 08, 2024

Random files
Ontario-Chatham-Kent-International-Power-GDF-Suez-from-Lagoon-Rd-3.jpg
Chatham-Kent, OntarioChatham-Kent, Ontario
IA-Earlham-blade-waste-5.jpg
Discarded wind turbine blades, IowaDiscarded wind turbine blades, Earlham, Iowa
Castrol-oil-wind-turbine.png
Oil needed in industrial wind turbineOil needed in industrial wind turbine
lowell-mtn-vt-turbine-site.jpg
Green Mountain Power wind turbine site on Lowell Mountain, Vt.Green Mountain Power wind turbine site on Lowell Mountain, Vt.
home-abandonment.png
Homes for sale near wind turbines in Victoria, AustraliaHomes for sale near wind turbines in Victoria, Australia
Paulding.jpg
Oil leaks from 10-year-old wind turbineOil leaking from the 10-year-old Vestas wind turbines in the “Blue Creek Wind Farm” in Paulding and Van Wert Counties, Ohio
Mt-Emerald-output--2022.png
Mount Emerald, Queensland, Australia: time in 2022 at different output rangesSteven Nowakowski of Rainforest Reserves Australia collected 2022 5-minute output data for the 180-MW Mount Emerald wind energy facility in Queensland, Australia. The average output was 26.8% of capacity - generating at or above that rate of 48.3 MW only 40% of the time. The median output was 18.1% of capacity (meaning that half the time it was generating less than 32.6 MW.
KS5-bladelift.jpg
Crane lifts first of three blades up to the rotor assemblyCrane lifts first of three blades up to the rotor assembly

Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon