National Wind Watch Picture Gallery

844 files in 3 albums with 0 comments viewed 939,726 times
Photos


IL-Ellsworth.jpg

718 files, last one added on Jun 03, 2020
Album viewed 14061 times

Graphics


wind-turbines-ugly-noisy-lethal-futile-blight-for-naught.png

122 files, last one added on Jun 27, 2018
Album viewed 9555 times

Videos


magdeburg-windrad-brennt.avi

4 files, last one added on Mar 16, 2019
Album viewed 1489 times

 

3 albums on 1 page(s)

Latest additions
IL-Ellsworth.jpg
Ellsworth, IllinoisTwin Groves Wind Farm near Ellsworth, Illinois, May 29, 2019 - photo by David ProeberJun 03, 2020
TX-Taft-fire-200308.jpg
Fire: Texas, March 8, 2020Fire, March 8, 2020, between Taft and Portland, TexasMar 11, 2020
DE-Obbach-foundation.jpg
Foundation slabThe steel and concrete base of the wind turbine is built on this foundation - photo by Uwe EichlerDec 29, 2019
DE-Obbach-base.jpg
Wind turbine baseSteel rebar ready for the concrete - photo by Uwe EichlerDec 29, 2019

Random files
turmsegmente-2-6-achsigen-Sattel-02.jpg
Tower sections on trailersTower sections on trailers
Santa_Developer.jpg
Luckies are easy on my throatAnd wind developers care about your community
Maple-Ridge-Antonelli.jpg
Farm: Tug Hill Plateau in Lowville, New YorkA farm sits in the foreground of Vestas Wind Systems turbines at the Maple Ridge Wind Farm on the Tug Hill Plateau in Lowville, New York - photographer: Ron Antonelli/Bloomberg
StoystownPA-Forward-635.jpg
Construction at Forward Wind Energy Center, Stoystown, PennsylvaniaConstruction at Forward Wind Energy Center, Stoystown, Pennsylvania
UD-turbine_site_09apr10_06.jpg
Gamesa G90 foundationGamesa G90 (2 MW) - “more than 50 loads of cement, 60 tons of rebar, and one very large crane”
Eurus_Soya_misaki_Wind_Farm_Hokkaido_1.jpg
Soya Misaki, Hokkaido, JapanFrom Eurus Energy
windfarms_seven_trees_road_Hallet_012.jpg
Seven Trees Road near Hallett, South AustraliaSeven Trees Road near Hallett, South Australia - Suzlon S-88 V3 2.1-MW turbines, 125 m tall - Proposed to have around 200 turbines when the 5 stages are complete. Hallett 1-4 are currently operating, but have had significant noise issues. 16 turbines of the 34 turbines at Hallett 2 were turned off at night because of tonality issues, now supposedly fixed, but according to locals, as noisy as ever. Photos by Mary Morris, Eudunda.
E-126-crane2.jpg
Enercon E-126/6 MW in Emden, GermanyEnercon E-126/6 MW in Emden, Germany - rotor diameter 127 m (417 ft; swept area 12,668 sq.m [3.13 acres]), total height 198.5 m (651 ft)

Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: