National Wind Watch Picture Gallery

865 files in 3 albums with 0 comments viewed 1,032,801 times
Photos


Thorney-fire-4.jpg

738 files, last one added on Apr 25, 2022
Album viewed 14635 times

Graphics


rotor-sizes-Vestas.png

123 files, last one added on Sep 10, 2021
Album viewed 9854 times

Videos


magdeburg-windrad-brennt.avi

4 files, last one added on Mar 16, 2019
Album viewed 1628 times

 

3 albums on 1 page(s)

Latest additions
Thorney-fire-4.jpg
Turbine fire in Thorney, EnglandTurbine fire - French Drove, Thorney, Cambridgeshire fens, 24 April 2022 - photo by Terry HarrisApr 25, 2022
Thorney-fire-3.jpg
Turbine fire in Thorney, EnglandTurbine fire - French Drove, Thorney, Cambridgeshire fens, 24 April 2022 - photo by Terry HarrisApr 25, 2022
Thorney-fire-2.jpg
Turbine fire in Thorney, EnglandTurbine fire - French Drove, Thorney, Cambridgeshire fens, 24 April 2022 - photo by Terry Harris via BBCApr 25, 2022
Thorney-fire-1.jpg
Turbine fire in Thorney, EnglandTurbine fire - French Drove, Thorney, Cambridgeshire fens, 24 April 2022 - photo by Casey GittosApr 25, 2022

Random files
UMinn25.jpg
Base of wind turbine foundation: concrete and steelUniversity of Minnesota Outreach, Research and Education Park, 2011 - the base of the foundation is 10 feet deep and 60 feet in diameter, the foundation consists of 40 tons of steel rebar
Gratiot-Co-WI-Aristeo.png
Gratiot County Wind, MichiganThe project site was spread over 88 miles - photo by courtesy of Aristeo Construction
Enercon.jpg
Enercon wind turbines and substationEnercon wind turbines and substation
Gamesa-Scansano2.jpg
Scansano, Toscana, ItalyScansano, Toscana, Italy - 2-MW Gamesa G90’s, 112 m (367.5 ft) - from Gamesa
wind-turbines-maria.jpg
Naguabo, Puerto Rico: wind turbines destroyed by hurricane MariaWind turbines in Naguabo, Puerto Rico, had their blades sheared off by the ferocious winds of Hurricane Maria’s northern eyewall on September 20, 2017. Image credit: NWS San Juan.
MarsHill-Nov-72.jpg
“Like a barbed wire fence”“Like a barbed wire fence” - Mars Hill, Maine - by J. Kirlin
Brand-Windmolen.jpg
Fire in the Netherlands, October 31, 2006Fire in the Netherlands, October 31, 2006
lindenberger-p8.gif
As more wind is added to the grid, its effective capacity, or capacity credit, is progressively lowerAs more wind is added to the grid, its effective capacity, or capacity credit, is progressively lower - from: Dietmar Lindenberger, “Costs of integrating wind energy in Germany”, presented at International Energy Association workshop “Integration of wind power into electricity grids: economic and reliability impacts”, Paris, 25 May 2004

Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: