National Wind Watch Picture Gallery

893 files in 3 albums with 0 comments viewed 1,076,860 times
Photos


blade-dump-Ravenshoe.jpg

760 files, last one added on Nov 27, 2022
Album viewed 15048 times

Graphics


scream.jpeg

129 files, last one added on Nov 13, 2022
Album viewed 10013 times

Videos


magdeburg-windrad-brennt.avi

4 files, last one added on Mar 16, 2019
Album viewed 1687 times

 

3 albums on 1 page(s)

Latest additions
blade-dump-Ravenshoe.jpg
Disused wind turbine bladesDisused wind turbine blades dumped in Ravenshoe, Queensland, AustraliaNov 27, 2022
concrete-pour-turbine-base.jpg
Concrete filling of wind turbine baseViking Energy, Shetland, Scotland - 103 such bases using 70,246 m³ of concrete produced from two batching plants created on siteNov 19, 2022
eolico.jpg
Wind turbine landscape in ItalyNov 19, 2022
scream.jpeg
ScreamNov 13, 2022

Random files
fpl-nee-burn-2.JPG
Clear Lake, Iowa, December 2010Clear Lake, Iowa, December 2010 - Florida Power & Light (Nextera)
Ontario-Chatham-Kent-International-Power-GDF-Suez-from-Erieau-Rd-7.jpg
Chatham-Kent, OntarioView from Erieau Rd - photo by David Libby
Pryor-Mtn.JPG
Pryor Mountain, MontanaFour of the 114 giant wind turbines marring the landscape near Pryor Mountain, Montana - photo by Mark Holloway
Blacklaw4.jpg
Black Law wind facility, Forth, ScotlandBlack Law wind facility, Forth, Scotland
ARSAEI-turbine-over-house.jpg
1.5-MW 400-ft-high 640 feet from a home in Scituate, Mass.1.5-MW 400-ft-high $6-million wind turbine 640 feet from a home in Scituate, Massachusetts - photo by courtesy of Alliance for Responsible Siting of Alternative Energy Installations, www.altenergysiting.org
Locust-Ridge-1900.jpg
No trespassing - Locust Ridge, Mohonoy City, PennsylvaniaNo trespassing - Locust Ridge, Mohonoy City, Pennsylvania - by courtesy of Annette Smith
Padubidri2.jpg
Residents of Padubidri, Avaralu, Abbedi, Palimar and Nandikoor (India) - Aug. 22, 2007Residents of Padubidri, Avaralu, Abbedi, Palimar and Nandikoor (India) joined together on Aug. 22, 2007, at the proposed wind energy site of Suzlon Company and urged them to restore the infrastructural facilities damaged by them. The protestors demanded that Suzlon authorities repair the extensively damaged road between Avaralu and Matti, demanded a halt to the encroachment of land and oppressing of the locals, and demanded an explanation for encroaching on the Kanchinadka school grounds. From Daijiworld.
E-126-2.jpg
Enercon E-126/6 MW in Emden, GermanyEnercon E-126/6 MW in Emden, Germany - rotor diameter 127 m (417 ft; swept area 12,668 sq.m [3.13 acres]), total height 198.5 m (651 ft)

Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: