National Wind Watch Picture Gallery

953 files in 2 albums with 0 comments viewed 1,299,406 times
Photos


Twin-Groves-IL.jpg

802 files, last one added on Mar 02, 2025
Album viewed 27228 times

Graphics


WV-size.png

151 files, last one added on Feb 06, 2025
Album viewed 12992 times

 

 

2 albums on 1 page(s)

Latest additions
Twin-Groves-IL.jpg
Twin Groves wind facility, IllinoisTwin Groves wind facility, McLean County, Illinois - posted on Facebook by Anton TJ Heinrichs - photographer Brian BowlesMar 02, 2025
SugarCreek1.jpg
Dirty oilThese are a couple examples of the leaking seen at the Sugar Creek facility in Logan County, Illinois - posted on Facebook by Anton TJ Heinrichs - photographer Brian BowlesMar 01, 2025
SugarCreek5.jpg
Dirty oilThese are a couple examples of the leaking seen at the Sugar Creek facility in Logan County, Illinois - posted on Facebook by Anton TJ Heinrichs - photographer Brian BowlesMar 01, 2025
SugarCreek2.jpg
Dirty oilThese are a couple examples of the leaking seen at the Sugar Creek facility in Logan County, Illinois - posted on Facebook by Anton TJ Heinrichs - photographer Brian BowlesMar 01, 2025

Random files
carleton-rotorassembly.jpg
Carleton College, MinnesotaCarleton College, Minnesota
Ontario-Chatham-Kent-International-Power-GDF-Suez-from-Erieau-Rd-19.jpg
Chatham-Kent, OntarioChatham-Kent, Ontario
Friendly-1~0.jpg
Concrete pour for wind turbine base"Friendly Windtechnology" - that's the name of the Ukrainian company erecting the Ostrovsky windpower facility in Transcarpathia on behalf of UK Wind Parks. The area under the construction of the first 4.8-MW turbine is half a hectare (~1.24 acres).
Deerfield-turbine-base-2.jpg
Wind turbine baseWind turbine base
Lewis-burningturbine.gif
Effigy protest on Lewis, ScotlandEffigy protest on Lewis, Scotland
Friendly-2.jpg
Wind turbine base - Ukraine"Friendly Windtechnology" - that's the name of the Ukrainian company erecting the Ostrovsky windpower facility in Transcarpathia on behalf of UK Wind Parks. The area under the construction of the first 4.8-MW turbine is half a hectare (~1.24 acres).
red-lights.jpg
Red lights on wind turbinesRed position lights shine on wind turbines in the "Odervorland" wind farm in the Oder-Spree district. 15 January 2020, Brandenburg, Sieversdorf. Photo: Patrick Pleul/dpa-Zentralbild/ZB (via Getty Images)
Lista-histogram.jpg
Hours of generation by Lista wind plant, NorwayHistogram of hours generating at each 3.8-MW range, from 0 to maximum 71.3 – 2022, Lista wind energy facility, 31 × 2.3-MW Siemens SWT-93 wind turbines: Average annual output ~26.9 MW – at or above that rate only ~44% of the time

Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon