LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Brussels may get a wind turbine 

Credit:  Helen Lyons | The Brussels Times | Friday, 26 February 2021 | www.brusselstimes.com ~~

A 150-metre high wind turbine could be constructed right next to the beltway or “Ring” around Brussels and the canal, and it would be built by Coca-Cola and the energy company Luminus.

If the application is approved, the turbine will be located at a site on the Rue de Zuen, behind the IKEA store and the Coca-Cola offices. Its 150 metre height includes the blades, and is similar to the height of the turbines located further along the canal in Sint-Pieters-Leeuw, reports Bruzz.

The plans for the wind turbine have been underway for some time, but now that the public inquiry phase has begun, construction is getting closer.

The planned capacity is 2.4 megawatts (MW), which is modest for a new turbine. Land ones that generate more than 3 MW are already in use, and ones at sea can generate over 8 MW.

Around 70% of the electricity it would produce would be used by Coca-Cola, with 30% returned to the power grid.

The turbine will mainly be visible from points in Anderlecht or from certain heights, Luminus says, with construction barely visible or not visible at all from the city center of Brussels.

Bruzz reports that the wind turbine won’t be able to be glimpsed from the pedestrian zone, but will be visible from the Place Poelaert. People driving on the smaller beltway, or the “Little Ring,” will be able to catch glimpses of the blades.

The turbine will be shut down throughout the year as needed to protect animals, in particular in summer and autumn so that bats don’t get caught in its blades. Luminus says the sound generated from the turbine will be indistinguishable from ambient noise.

The public can view the plans and comment on them until 16 March, at which point the Anderlecht consultation committee will assess the permit application.

Source:  Helen Lyons | The Brussels Times | Friday, 26 February 2021 | www.brusselstimes.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky