LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Windfarm suffers blade damage 

Credit:  Fiona Reid | Friday 15th May 2020 | www.dng24.co.uk ~~

Damage has been identified on the blades of two turbines at the Minsca windfarm near Waterbeck.

And operators Ventient Energy this week confirmed replacement blades will be needed.

It comes after surveyors were spotted near the village looking at road routes to the windfarm. Ventient explained their transport surveyors are currently exploring alternatives routes to transport the new blades to site.

A spokeswoman said: “The periodic maintenance of the fleet had identified the need for blades replacements on two turbines due to damage on the blades that cannot be repaired on site and are required to be returned to a workshop environment. We would like to confirm that there is no damage to the blade tip and no actual visible damage. The damages do not represent a safety hazard, and the turbines are currently on stop to protect any further damage to the blades.

“New blades need to be transported to the site. The original transport route is currently restricted due to a current road closure and bridge maintenance in the near future which is preventing the issue of a transport permit.”

The firm are working to ensure that any transport, maintenance and repair of the blades is compliant with the current Covid-19 restrictions, and the spokeswoman stressed the safety of the community and the environment will be considered all the time.

She added: “We are looking to get this work completed as soon as possible but at this stage, are unable to give a clear date when these repairs will be completed.”

Source:  Fiona Reid | Friday 15th May 2020 | www.dng24.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI M TG TS G Share

Tag: Accidents


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky