LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Norway to build wind farm despite concerns of reindeer herders 

Credit:  Lefteris Karagiannopoulos | Reuters | www.reuters.com ~~

Norway said on Friday it would build a wind park in an area used for reindeer grazing despite U.N. calls to suspend the project to study the impact on the indigenous herders’ livelihoods.

The Petroleum and Energy Ministry said it would proceed with the 288 megawatt (MW) Storheia wind park, which is part of Europe’s largest onshore wind power project being developed by the Fosen Vind consortium.

The group, owned by TroenderEnergi, Statkraft and the Nordic Wind Power consortium, is building six wind farms with combined capacity of 1,057 MW at a cost of 11 billion crowns ($1.26 billion).

“After careful consideration, the ministry has concluded that there is no basis for stopping the (building) of the Storheia wind turbines,” the ministry said in a statement.

In a Dec. 10 letter, the U.N. Committee on the Elimination of Racial Discrimination asked Norway to suspend the project so it could examine a complaint that the project would disturb reindeer herding, a traditional activity of the Sami people.

Reindeer herders have said the sight and sound of the turbines in the park, to be built in an area on Norway’s northwest coast used as pastures during winter months, could frighten the animals.

The ministry said Norway tried to address U.N. requests but would disregard it on this occasion after the wind farm had passed all domestic legal checks.

Most of the infrastructure was already completed so turbines could be installed between April and August, the ministry said.

Storheia will have 80 wind turbines of 3.6 MW each, constructed by Vestas and is due to be commissioned in 2019. The whole project will be completed in 2020.

Statkraft owns 52.1 percent of the consortium, followed by the Nordic Power group with 40 percent and TroenderEnergi with 7.9 percent.

Editing by Gwladys Fouche and Edmund Blair

Source:  Lefteris Karagiannopoulos | Reuters | www.reuters.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky