LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Review finds information lacking in wind farm plan 

An engineering report has found gaps and deficiencies in the draft Renewable Energy Approval (REA) documents to construct a wind farm in Dutton Dunwich.

The municipality retained Morrison Hershfield Limited to evaluate the Strong Breeze Wind Project draft report prepared by Stantec Consulting Ltd. for Invenergy.

The findings were released during a regular council meeting on Wednesday.

In the Morrison Hershfield report, the company found information lacking in the draft REA submission from environmental and engineering perspectives.

Inconsistencies with respect to the rated capacity of the two types of turbine models under consideration are also documented in the report prepared for the municipality.

In other areas, the study found information lacking on underground electrical line routes, potential impacts to municipal infrastructure, height of aerial electrical lines and the anticipated span between support posts.

The report is also critical of how setback and property line measurements for the proposed turbine locations were derived.

The Morrison Hershfield report found: “The assessment appears to have been undertaken as a desktop exercise only.”

In the wind farm proponent’s decommissioning plan documents, the municipal study determined the intent is to return the land to pre-existing condition or better, yet turbine and transformer foundations will only be removed to a depth of approximately one metre and re-vegetated.

According to the review done for the municipality, the REA submission also lacks sufficient archaeological, cultural and natural heritage assessments.

No detailed review was found in the documents for potential impacts the project may have on potable water sources.

Council will include the findings in its municipal consultation form as part of the 90-day municipal review process, as set out in provincial regulations for wind farm proposals.

Over 80 per cent of Dutton Dunwich property owners have voted against wind farms within their community.

Invenergy wants to construct up to 20 wind turbines in Dutton Dunwich.

[rest of article available at source]

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky