LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]




Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind turbine catches fire in shadow of Saga nuclear plant 

Credit:  The Asahi Shimbun | August 22, 2017 | www.asahi.com ~~

A wind turbine at the Kushizaki power plant in Karatsu, Saga Prefecture, is on fire with black smoke pouring out on the afternoon of Aug. 21. (Provided by Junji Ota)

KARATSU, Saga Prefecture – A 60-meter-high wind turbine [Gamesa G80] near a nuclear power plant in northern Kyushu caught fire on Aug. 21, posing difficulties for fire-fighting efforts from the danger of falling parts.

A resident reported the blaze at the Kushizaki wind-generating power plant in an emergency phone call at around 2:55 p.m. One of the turbine blades and the connecting area around the base of the blades caught fire, according to Saga prefectural police and fire department officials.

The blaze was confirmed extinguished at around 6:50 a.m. of Aug. 22. No injuries were reported.

A fire department spokesperson said firefighters were unable to shoot water at the flames due to the fear of falling debris.

An official of Tokyo-based JFE Engineering Corp. said the wind turbine is operated by one of its affiliated companies. JFE Engineering said the cause of the fire is under investigation.

The Kushizaki plant in the city’s Chinzeimachikushi district is located about 700 to 800 meters from the Kyushu Electric Power Co.’s Genkai nuclear power plant in Genkai in the same prefecture across the sea.

The wind-generating power plant, with a full output capacity of 1,980 kilowatts, started generating electricity in April 2004. Power produced from the plant has been sold to Kyushu Electric.

The wind turbine, made of iron, consists of three 40-meter-long rotor blades made of resin, according to JFE Engineering.


[SagaTV]

Source:  The Asahi Shimbun | August 22, 2017 | www.asahi.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Tags: Photos, Video


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky