LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

DTE Energy Develops Solution for Thumb Schools Wind Energy Project 

Detroit Edison has developed solutions
to restart a wind energy project in the Elkton-Pigeon-Bay Port Laker
Schools in the Thumb area.
The utility’s engineering team has expedited an analysis needed to
determine the best way to install wind generators for interconnection with
Detroit Edison’s electric grid that meets the needs of the school district
as well as the safety of children attending school where the project will
generate electricity.
The schools utilized a $265,000 grant from the Michigan Public Service
Commission (MPSC) for the project, but began operating the generators
before completion of an engineering and safety study from Detroit Edison
for the interconnection. Detroit Edison advised the school district to shut
down the generators to comply with MPSC rules until the study could be
completed to ensure the generators can safely and compatibly interconnect
with the school’s electrical system.
“Detroit Edison is fully supportive of renewable energy programs and we
have been working with the school district to accommodate its wind power
project,” said Vince Dow, Detroit Edison vice president. “We have expedited
the time it would normally take for such an engineering study and believe
we’ve developed a solution, which will expedite a safe start-up of the
project. We intend to present the study to the district as soon as we can
schedule a meeting.
“It is extremely complex to connect large wind generators to the
electric grid and we needed to ensure that the right protective equipment
is in place to ensure the safety of the children at the school, as well as
the reliability of the electrical system,” Dow added.

SOURCE DTE Energy

prnewswire.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky