LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Massive wind turbine parts arrive at Clifton site 

Credit:  Linda Coan O'Kresik | BDN – Saturday, Sept. 24, 2016, bangordailynews.com ~~

windturbine 092316 A LCO
A 14-foot diameter, 60-ton base of a Vestas V90-1.8 megawatt wind turbine is hauled up the access road to the Pisgah Mountain wind farm site in Clifton Friday morning. This is the first of 45 pieces that will be trucked from the port in Searsport to the site in Clifton over three weeks. Developer Paul Fuller said that the five turbines need to be in place before Oct. 15 to meet a deadline required as part of the Public Utility Commission’s 20-year Community-based Renewable Energy contract between Pisgah and Emera Maine. Each turbine has a hub height of 305 feet and each blade is 140 feet long. A 351-foot crane was brought in to install them on the mountain. This $25 million wind farm project was unanimously approved by the Clifton Planning Board back in October 2011.

windturbine 092316 B LCO
The 14-foot diameter, 60-ton base of a Vestas V90-1.8 MW wind turbine is hauled along the access road to the Pisgah Mountain wind farm site in Clifton Friday morning. This is the first of 45 pieces to be brought in over three weeks to build the five wind turbines.

windturbines 092316 E LCO
Workers look over the situation after the back wheels went off the access road while hauling the 60-ton base of a wind turbine up to the Pisgah Mountain wind farm site in Clifton on Friday morning. This is the first of 45 pieces to be brought in over three weeks to build the five wind turbines.

windturbine 092316 C LCO

Source:  Linda Coan O'Kresik | BDN – Saturday, Sept. 24, 2016, bangordailynews.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Tag: Photos


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky