LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

$200K in lost energy savings later, Bayonne’s wind turbine is spinning again 

Credit:  By Jonathan Lin | The Jersey Journal | April 01, 2016 | www.nj.com ~~

BAYONNE – After costing the city more than $200,000 in energy savings since breaking down last June, the city’s long dormant wind turbine is finally spinning again.

Bayonne Municipal Utilities Authority Executive Director Tim Boyle said yesterday that the turbine has been completely repaired and went back into operation March 21.

The 260-foot wind turbine, located at Oak and Fifth streets, cost the city roughly $25,000 in energy savings for every month it went unrepaired, Boyle said. Repairs were originally scheduled to take place in November, but were delayed until early March.

“We’re happy to have (the turbine) back and generating energy and revenue again,” Boyle said.

Repairs on the turbine consisted of switching out a broken bearing that is part of the turbine’s generator with a new bearing. As part of that process, the turbine’s three massive blades had to be removed and then reattached.

Leitner-Poma America, which is based in Colorado and is affiliated with the Italian company that made the turbine, led the repair work, Boyle has said.

The MUA official said the broken bearing was shipped Wednesday to Europe to undergo forensic testing to determine how it broke. Leitner-Poma America or an affiliated company is expected to produce a report on what went wrong in “five or six weeks,” Boyle said. “We will wait to hear back from the forensic report, and then we’ll consider our next steps once we hear what the manufacturer’s position is.”

He has previously said that the bearing that broke was supposed to last 20 years, but only lasted three, and that “if there’s a finger to be pointed or fault to be assigned, that will happen in time.” The part needed to repair the turbine is estimated to cost $298,000, Boyle has said.

Source:  By Jonathan Lin | The Jersey Journal | April 01, 2016 | www.nj.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky