LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Trust holds off on closure of Wind 2 loan 

Credit:  By RYAN BRAY | The Enterprise | November 26, 2015 | www.capenews.net ~~

The Massachusetts Clean Water Trust notified town manager Julian M. Suso Tuesday that the entirety of the town’s loan on Wind 2 is still outstanding, and the town will have to pay interest as well as the principal, if it ceases operation of Wind 2.

The town borrowed $4,865,000 from the trust for the construction of Wind 2, the second of the town’s two wind turbines. The town submitted a project completion certificate to the Massachusetts Department of Environmental Protection in March 2013. However, a letter dated April 2, 2013, from the trust’s executive director, Susan E. Perez, said the trust would not sign off on completion of the project, if it is suggested that the turbine might stop operations.

The Falmouth Zoning Board of Appeals is currently weighing whether to issue a cease-and-desist order for Wind 2, similar to the one it issued to Wind 1 in September. Residents are appealing for the order, challenging a finding from building commissioner Eladio S. Gore that Wind 2 can continue operation while the town goes through the process of obtaining a special permit for the turbine.

In the same letter, the trust told selectmen that the town would owe full interest and principal on the loan if Wind 2 stops producing energy. Under the existing terms of the loan, the town owes zero percent interest as long as the turbine remains in operation. The letter also stated that any changes in the turbine’s operation would have to be approved by the trust and that the trust would not approve any request to make Wind 2 non-operational.

Source:  By RYAN BRAY | The Enterprise | November 26, 2015 | www.capenews.net

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky