LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Repairs on Bayonne’s turbine generator delayed until late next month, officials say 

Credit:  Repairs on Bayonne's windmill generator delayed until late December, officials say | By Jonathan Lin | The Jersey Journal | November 06, 2015 | www.nj.com ~~

BAYONNE – Repairs on the wind turbine used to power the city’s Oak Street and Fifth Street pumping stations have been delayed until late December, according to the Bayonne Municipal Utilities Authority.

BMUA Executive Director Tim Boyle said the part needed to repair the turbine “was further back-ordered” and has been rescheduled to arrive in Bayonne in late December. The turbine was previously set to be repaired as early as this month.
Boyle told The Jersey Journal the delay is “very disappointing news.”

The 260-foot wind turbine, off East Fifth Street, went into operation in June 2012, with city officials touting energy savings of up to $300,000 a year. But it stopped working in June.

Every month that the turbine goes unrepaired costs the city roughly $25,000 in energy savings, Boyle has said. Assuming the turbine is fixed by the end of January, the money lost in energy savings would total about $175,000.

The part needed to repair the turbine – which is estimated to take one to four days to install upon arrival – will cost $298,000, down from the original repair cost estimate of $350,000, Boyle said.

United Water monitors and maintains the windmill under a 40-year deal with the BMUA.

Boyle has said MUA workers detected vibrations coming from the turbine in June and the manufacturer shut off the generator remotely and then sent a representative to inspect it.

Boyle has said he was told these types of generators are supposed to last 20 years. The city got three years out of its generator.

For the past two years, the turbine has produced about 3.3 gigawatt hours of electricity per year, enough to power 600 single-family homes for a year.

Source:  Repairs on Bayonne's windmill generator delayed until late December, officials say | By Jonathan Lin | The Jersey Journal | November 06, 2015 | www.nj.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Tag: Accidents


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky