LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Kingston Board of Health modifies Independence wind turbine abatement order 

Credit:  By Kathryn Gallerani | The Kingston Reporter | Oct. 19, 2015 | kingston.wickedlocal.com ~~

The Board of Health Monday night approved a modified abatement order that changes the requirements for shutting down the Independence wind turbine when in excess of state noise regulations, standards and policies.

Wind direction will no longer be a determining factor dictating when the turbine will be shut down, and the turbine would need to be shut down for an additional hour a day under certain conditions.

The order requires that the turbine be shut down year-round between the hours of midnight and 4 a.m. when wind speeds reach at least 7 meters per second at the turbine hub, regardless of wind direction, and between 11:30 p.m. and 4:30 a.m. when wind speeds exceed 9 meters or more per second, also regardless of wind direction.

The first abatement order approved by the Board of Health in August 2014 required shutdown from midnight to 4 a.m. when the wind is blowing from a south or southwest direction in excess of 8 meters per second.

Kingston Wind Independence LLC is also ordered to conduct additional sound sampling to refute predicted exceedances of state noise regulations at locations east of Route 3 and in the Copper Beech Drive neighborhood west of Route 3. Additional study would be conducted in accordance with state protocol.

The order additionally opens the door to KWI employing a low noise mode rather than shutting down the turbine, but KWI must first prove that the turbine would be in compliance with the state’s noise regulation by conducting further studies.

For the complete story, check back at www.kingston.wickedlocal.com and read Friday’s Kingston Reporter.

Source:  By Kathryn Gallerani | The Kingston Reporter | Oct. 19, 2015 | kingston.wickedlocal.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky