LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Hanover wind turbine operator says frequent shutdowns are to be expected 

Credit:  By Kaila Braley | The Patriot Ledger | Aug. 26, 2015 | www.patriotledger.com ~~

HANOVER – The wind turbine on Route 53 stopped working again Sunday afternoon, but this time, it was because it was working properly, Tim Stearns, the chief operations officer for turbine operator Aeronautica Windpower said.

On Sunday, the power grid sent too much energy into the turbine, Stearns said, which made a protective mechanism go off in the machine that stopped it from running.

“That’s a normal procedure. It’s very temperamental, but that’s by design. It’s the way it should be,” he said.

When an error like this happens, the Aeronautica employees restart the machine and check it for damage, just to be safe, Stearns said.

“Something like this is going to happen 70 times a year,” Stearns said. “We might have to reset it for any reason.”

Just because the turbine isn’t moving, doesn’t mean it’s having technical problems again, Stearns said.

“We’ve been having low wind. Sometimes it’s just not windy enough to make it work,” he said.

The turbine has had a history of mechanical and technical problems since it was built, which has prevented Hanover from earning profits or taking ownership of the machine, Town Administrator Troy Clarkson said.

The most recent repair was done last Tuesday by Aeronautica, when the hydraulic system was not pressurizing properly.

“The repairs result from faulty installation by the initial contractor, Lumus Construction,” Clarkson said.

The machine was intended to save the town $50,000 a year in energy costs, Clarkson said.

A report presented by Clarkson at the last selectmen’s meeting on Aug. 17 shows the energy savings produced by the machine since 2013 has been $9,008. Of that amount, $6,532 was produced in 2014, during which the turbine ran for 186 days.

Source:  By Kaila Braley | The Patriot Ledger | Aug. 26, 2015 | www.patriotledger.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky