LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

The masts must go too, say wind farm protestors 

Credit:  The Galloway Gazette | 25 February 2015 | www.gallowaygazette.co.uk ~~

After a successful campaign to block a wind farm on Machars land, protestors are now putting pressure on developers to remove testing masts.

EDF Renewables announced plans to pull the plug on the Airriequhillart Wind Farm near Barrachan last month but have made no move to take down two wind monitoring masts on the site which have towered ove Mr Shiells’ home for years.

Now Andy Shiells who led the campaign against the plans has called on the energy giant to get them shifted.

Mr Shiells said this week: “According to our records the planning for the erection of the two EDF masts connected to the project expires on March 8th after three years.

“We have asked the CEO of EDF Renewables, Chistian Egal, to remove them, especially as his firm did not fully comply with the planning regulations when they sneaked them up in the first place.

“We do not wish these blots on the landscape to remain longer than necessary. They are a grim reminder of a trying and stressful three years of fighting what was always an absurd proposal.

“We have also raised the matter with our local MSPs.”

EDF Energy Renewables responded to say the company was working on having the masts removed but it woudl take time.

Tony Scorer from the company responded to Mr Shiells to say: “Rest assured that we are working to organise the dismantling and removal of the monitoring masts as soon as possible.

“We ourselves have no wish to leave them in place any longer than necessary but the work to remove them is not straightforward and requires specialist contractors to safely dismantle the mast and supporting structures.

“This work also needs to be carried out in safe weather conditions.

“So while I can only apologise if you feel inconvenienced by their continued presence, I can assure you that we will remove them as soon as our contractors are available and the weather conditions allow for the work to be carried out safely.”

Source:  The Galloway Gazette | 25 February 2015 | www.gallowaygazette.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon