LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Good windmills torn down as subsidy runs out 

Credit:  by Janene Van Jaarsveldt | NL Times | Nov 17, 2014 | www.nltimes.nl ~~

Windmills that are still in working order, are being replaced with new ones as operators do not receive subsidy for the old ones.

Energy companies, farmers and other operators of renewable energy want to demolish and replace 172 recently built mega windmills in order to collect an additional subsidy. If they receive a permit for the new turbines in this year still, they will claim more than 350 million euro in green power subsidy. This is evident from research by the Netherlands Association Residents Wind Turbines (NLVOW) in municipalities and provinces throughout the Netherlands. Over the last couple of months a large number of permit applications for the replacement of turbines that were built over the last decade have been received.

These mills are technically still in good order, but because of their age not eligible for the green power subsidy. Several operators are choosing to demolish the mills, sell them second hand and replace them with a similar new one. These new mills will then again be eligible for subsidy through the so-called subsidy regulation sustainable energy production (SDE+).

“These turbines can function for another ten to fifteen years, but are replaced and re-registered since turning with a subsidy is much more lucrative.” says Rob Rietveld of the NLVOW. “This has nothing to do with sustainability, but everything with pocketing double subsidies.”

In the Second Chamber, Agnes Mulder (CDA) made her opposition to this situation clear. “This involves public money that should be used as effectively as possible for a more sustainable energy supply. Minister Kamp himself says that windmills last 15 to 20 years. Subsidy driven replacement after 10 years can not be explained.” The Second Chamber will discuss renewable energy today.

In a response the Ministry of Economic affairs, who provides the subsidies, said that “from 2015 the subsidy will be adjusted so that it is no longer financially attractive to replace an older windmill with exactly the same windmill.”

The Ministry expects to receive a large number of subsidy applications in the coming weeks, as a result of the amended rules form January 1st.

Source:  by Janene Van Jaarsveldt | NL Times | Nov 17, 2014 | www.nltimes.nl

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky