LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

No one injured as huge crane topples at wind development site 

Credit:  Ministry investigates collapse of giant crane | By Scott Dunn, Sun Times, Owen Sound | Tuesday, October 21, 2014 | www.lfpress.com ~~

LUCKNOW – Since a giant crane toppled at the K2 Wind Farm project south of here last week, cranes are being disassembled and trucked from site to site instead of driven there, a K2 Wind spokesperson said.

No one was injured last Wednesday in the mishap that’s being investigated by the Ontario Labour Ministry and the crane contractor. Work resumed on the site Friday, Michael Sheehan said.

The collapse took place at what will be a 140-turbine, 270-megawatt project covering 7,700 hectares that is to be completed in July.

“K2 Wind is in the process of reviewing procedures for safely crawling cranes. Since last week’s accident, the two other main turbine erection cranes are being dissembled and then trucked to a turbine and reassembled,” Sheehan said in an e-mail from the Edmonton office of Capital Power, one of the three wind farm partners.

One of three big cranes on the site was damaged when it fell as it was being driven to a turbine site when conditions were wet, Sheehan said in a statement last week.

That damaged crane will be disassembled and removed from the site. That work should take one week and will likely begin Thursday, he said.

The big cranes are each mounted on a tracked machine which allow them to “crawl” from site to site.

“The cause of the accident is still under investigation and crane experts/specialists from Mammoet are on-site,” Sheehan said by e-mail.

The cranes, each with a 122-metre-long boom, come in to finish assembling each wind turbine after several smaller cranes set in place two of the five sections of the turbine. Smaller, wheeled cranes continue to be driven across the site, he said.

Source:  Ministry investigates collapse of giant crane | By Scott Dunn, Sun Times, Owen Sound | Tuesday, October 21, 2014 | www.lfpress.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Tag: Accidents


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky