LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Navitus Bay wind farm underground cable could leave ‘scar’ on Forest 

Credit:  By Karen Bate | Salisbury Journal | 15th August 2014 | www.salisburyjournal.co.uk ~~

Chairman of the New Forest National Park Authority, Pat Wyeth, claims that an underground cable linking the national grid to the Navitus Bay wind farm would leave a “permanent scar” across the Forest.

The New Forest National Park Authority (NPA) has hit out at the visual impact of the wind turbines in the controversial plan for the Hampshire coast.

Members have also raised concerns about an underground cable linking the wind farm with a national grid sub-station north of Ferndown in Dorset.

Bosses at the Navitus Bay Development Ltd (NBDL) coast have launched a £1million study of the sea bed, drilling bore holes and extracting material in a bid to devise the most suitable foundations for the 194 turbines.

A specialist survey vessel called Horizon GeoBay is fitted with water jets that keep it stationary, helping the crew to perform more accurate drilling.

Bore holes of various depths will enable experts to obtain 15 different sets of samples and compile a detailed analysis of the sea bed.

It comes after NBDL had its application for a Development Consent Order (DCO) accepted for examination by Government planners.

Project director Mike Unsworth said: “In parallel with seeking consent for the project, it’s vital that we continue to gather additional information about the site conditions to help inform our detailed design of the proposed offshore wind park.

“This latest investigation is the next step in the process of engineering an optimum design for the wind turbine foundations.”

The proposed wind farm will occupy a 60 square mile site west of the Isle of Wight and will generate enough low carbon electricity to power around 710,000 homes, offsetting approximately 1,290,000 tonnes of CO2 emissions every year.

The Government’s planning inspectorate will spend the next eight months examining the proposals before submitting its recommendation to the Secretary of State for Energy.

If planning permission is granted, construction work is likely to begin in 2017, with the first turbines starting to generate electricity two years later.

Source:  By Karen Bate | Salisbury Journal | 15th August 2014 | www.salisburyjournal.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon