LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Council refuse permission to wind turbine 

Credit:  Story by Seamus Enright | The Anglo-Celt | 12th August, 2014 | www.anglocelt.ie ~~

Cavan County Council has refused permission to a Cavan couple seeing to erect a single 80-metre high wind turbine with a rotor diameter of 82m, along with associated site works at Mountain Lodge in the east of the county.

The planning section of the local authority refused permission earlier this month, stating that the development at Tievenanass, not exceeding an overall tip height of 121 metres, was “outside of the footprint of existing and permitted wind farms in the area”.

Along with the turbine, permission was also sought to include site development works including new access track, new access point onto the public road, crane hardstanding area, turbine assembly area and underground cabling.

It was also adjudged that the height of the proposed turbine, which is greater than existing permitted turbines in the area, would be “prejudicial” to visual amenities in contravention of the Cavan County Development Plan.

Ballyduff turbine

Elsewhere, Liffey Energy was granted permission by Cavan County Council to make minor amendments to an existing turbine at Cloggagh, Ballyjamesduff.

The company propose to re-site the permitted turbine to a position approximately 130m South South-East of the previously approved location, with subsequent alterations to ancillary developments such as cable routes, access track, service track, crane hardstand and switchroom location.

All other aspects of the previously permitted development shall remain unaltered.

Source:  Story by Seamus Enright | The Anglo-Celt | 12th August, 2014 | www.anglocelt.ie

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Tag: Victories


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky