LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Dark side of renewable energy: megawatt turbines 

Credit:  By FRANK HAGGERTY | November 29, 2013 | www.ecori.org ~~

In the past few years most anyone that has gotten up in front of a crowd to speak about commercial megawatt wind turbines starts with an apology. The speakers usually say I’m all for green energy and I like the idea of renewable energy, but commercial megawatt turbines have serious issues. The days of apologizing before speaking about renewable energy programs in Rhode Island and Massachusetts are over.

The public needs to hear the truth about the maintenance issues with the gear-driven wind turbines installed in the past four years. Many of these turbines are suffering major catastrophic gearbox failures within three to five years of installation. Portsmouth (R.I.) Island High School is a prime example. The repair estimates range from $600,000 to a million dollars. The Portsmouth High School wind turbine sits there day after day with 40,000 vehicles going by the broken and forgotten megawatt turbine. There is no news on any repair date in the foreseeable future.

Massachusetts has several examples of turbines sited far too close to residential homes. Massachusetts Superior Court recently ordered wind turbines in Falmouth shut down from 7 p.m. to 7 a.m. The court agreed for the first time in U.S. history that the noise was hurting residents.

Noise and “shadow flicker” complaints against commercial wind turbines installed in Fairhaven, Scituate and Kingston also have been registered.

The green community and those interested in renewable energy need to bring a halt to the poor installations of commercial, land-based wind turbines larger than 1.5 megawatts. The community needs to focus on other sources of renewable energy. Those sources include photovoltaic, heat pumps, geothermal and fiber-optic lighting in industrial buildings. Too many resources are being wasted on commercial wind.

The current policies and actions with commercial wind turbines are making misbelievers in renewable energy.

Frank Haggerty is a Jamestown, R.I., resident.

Source:  By FRANK HAGGERTY | November 29, 2013 | www.ecori.org

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky