LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

U.S. DOE Funds Research on Modular Technology for Large Wind Turbines 

renewableenergyaccess.com

September 12, 2006

Waitsfield, Vermont [RenewableEnergyAccess.com] Development of 5- to 8-megawatt wind turbines by Northern Power is moving forward thanks to a $750,000 grant from the U.S. Department of Energy (DOE).

The Phase 2 Small Business Innovation Research (SBIR) grant will allow the company, a subsidiary of Distributed Energy Systems Corp., to continue development of key modular construction approaches necessary to build the turbines.

With blade lengths of 60 meters or greater and tower heads often weighing more than 450 tons, shipping, installing and maintaining larger turbines is a challenge.

Northern Power’s Phase 2 contract with the DOE covers manufacturing and assembly for permanent magnet generators and power converters, to improve the viability of large-scale wind power both on- and offshore. The project’s emphasis on modular designs is intended to permit easier subassembly transportation, less weight per component, partial power capabilities and more flexibility in providing onsite service.

“Over the last several years, our wind experts have focused on developing large-scale, direct-drive wind turbine generator and power converter systems,” said Darren Jamison, Northern Power’s president, “to address the cost, utility interconnection and equipment implementation issues that are prominent in the multi-megawatt wind market today.”

The first phase of the competitive, three-phase SBIR program is the startup phase, during which exploration is funded based on the technical merit or feasibility of a technology. Phase II grants enable development of the technology and evaluation of its commercial potential, and Phase III moves the product from the laboratory into the marketplace.

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky