LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Suzlon Energy announces $25-million blade retrofit programme for its S88 turbines 

Suzlon Energy Ltd has announced a retrofit programme to overcome the problem of the blades cracking during operations of some of its S88 turbines in the United States.

The retrofit programme involves the structural strengthening of 1,251 (417 sets) blades on S-88 (2.1 MW) turbines, of which 930 blades have already been installed while the remaining are either in transit or stocked as inventory.

“We have a close working relationship with our customers, and his programme is a proactive measure to safeguard the interest of all our stakeholders. The retrofit programme is designed to minimize impact for our customers and Suzlon,” said Andre Horbach, CEO, Suzlon Group.

The retrofit programme will be carried out by maintaining a rolling stock of temporary replacement blades, to minimize the downtime for operational turbines, and will completed over a period of six months. The programme will utilize Suzlon’s strong global technical capabilities and its blade manufacturing and service facility in Pipestone, Minnesota, for US Blades.

“The company, with its integrated global value chain and in-house blade design and manufacturing capabilities is well-equipped to resolve the issue within a short timeframe and in cost efficient manner. We are in close contact with all out customer and are keeping them fully informed of the progress. We expect no impact on the order and execution pipeline”, Horbach added.

The total estimated cost of the retrofit programme is estimated at Rs100 crores ($25 million), for which a provision will be made in Q4 of FY08.

domainb.com

3 March 2008

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky