LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Huge wind turbines arrive by rail today 

A train carrying the first wind turbines to be set up in B.C. will be passing through Prince George today.

Specially commissioned for the task, the train is tentatively expected to reach the city at 1 p.m. as it makes its way north to the future home of the Dokie wind farm, 40 kilometres northwest of Chetwynd.

It’ll will be quite the sight, said Ron Percival of Earthfirst Canada Inc., which owns the farm.

“These are pretty impressive machines and the blades on these turbines are 45 metres long and each one will take up two flat cars,” he said.

The train is 59 cars long, which is enough to carry the equipment for eight turbines – each turbine holds three blades.

The turbines, made by Vestas, a Danish company, are the largest commercial wind turbine available in Canada, Percival said, and each of them are capable of producing three megawatts, “which is a very large capacity for a wind turbine.”

“These are commercial-grade wind turbines that are design to stand in a very extreme climate, a very windy place, for 20 years so they’re very robust machines, heavy duty machines,” Percival said.

The eight will be installed this fall and are the first of 48 turbines intended to be up and operating at the site by fall 2009. Once up, they’ll produce 144 megawatts, enough to power 34,000 homes a year – or enough to power all the homes in Prince George and then some.

By Mark Nielsen
Citizen Staff

Prince George Citizen

16 July 2008

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon