LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

West P.E.I. power corridor not fixed: Webster 

The route for Maritime Electric’s high-voltage transmission line through West Prince is not a done deal, says Energy Minister George Webster.

The utility has applied to the province to build a 138,000-volt transmission line to carry wind power generated at the West Cape wind farm. A group has formed to oppose the route for the line, which would connect the O’Leary substation to the Sherbrooke station outside of Summerside. In addition, voltage on a new line from the wind farm to O’Leary is due to be increased from 69,000 to 138,000 volts.

Islanders for the Safe Transmission of Power says the line poses a health risk by passing too closely to homes. Tuesday night, it presented a 3,000-name petition at the P.E.I. legislature, demanding a 450-foot (137 metres) buffer zones between the line and homes, schools, parks, and sensitive use areas.

The group is concerned about the health risks associated with high voltage.

Webster noted Maritime Electric has not yet been granted permission to build on the route it is proposing.

“The actual corridor that was identified earlier is certainly not carved in stone, I want to make that extremely clear,” he said.

“It’s on the table for discussion as well as some other routes, Obviously, my opinion of this would be if we could find a route that has less risk, if there is risk, certainly I would be open for those suggestions.”

Maritime Electric has to get approval from the province before it can proceed with its planned route.

The Island Regulatory and Appeals Commission recently ruled against people from the area who had filed a complaint about the proposed power line based on health fears.

CBC News

14 May 2008

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky