LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

A dubious sort of leadership 

Credit:  Valley News | July 14, 2013 | www.vnews.com ~~

This is in response to the July 5 letter from Curt Peterson, which faulted Meredith Angwin for not adequately accounting for how energy use patterns will change in the future in her critical op-ed about the Vermont Comprehensive Energy Plan.

The goal of Vermont’s 2011 Comprehensive Energy Plan is to have 90 percent of all Vermont energy (not just electrical energy) come from renewables. Even Germany does not have such an extreme goal. To meet that goal, Vermont would use much more electrical energy for electrical and thermal purposes, such as geothermal heat pump systems, plug-in electric cars, space heating, etc. Vermont’s consumption of propane, fuel oil, natural gas, gasoline, diesel, etc., would decrease.

Energy-systems engineers calculated Vermont’s electrical energy would have to increase annually from about 6,000 gigawatt hours to between 15,000 and 18,000 by 2050. That projection accounts for significant energy efficiency efforts.

In defending Vermont’s adoption of the energy plan, Peterson commends Vermont’s leadership on energy policy as “insightful.” To assess that opinion, I offer two examples of what has resulted from the state’s leadership.

Under Vermont’s SPEED program, it will be paying the following prices to generating projects of less than 2.2 megawatts:

∎ 2010, for six months: 13.87 cents per kilowatt hour.

∎ 2011: 16.44 cents/kwh.

∎ 2012: 17.16 cents/kwh.

∎ 2013, for five months: 18.53 cents/kwh.

Note the rising trend. By 2017, due to this SPEED program, a cumulative amount that exceeds $131 million will be rolled into electric rates of already-struggling households and businesses.

The second example is the Lowell Mountain wind turbine project, which has become a PR disaster and will likely be a financial fiasco as well. It is producing energy at about 15 cents per kwh instead of the 10 cents that was projected.

Note:

∎  New England grid prices have averaged about between 5 and 6 cents per kwh for four years.

∎  Hydro-Quebec and Vermont Yankee prices are about 5.5 to 6 cents per kwh.

∎  Green Mountain Power bought 60 megawatts of steady, near-carbon-dioxide-free nuclear energy at 4.66 cents per kwh.

Willem Post

Woodstock

Source:  Valley News | July 14, 2013 | www.vnews.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky