LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]




Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Grid operators drop plan for rolling wind-farm outages 

Credit:  William Pentland, Clean Beta, blogs.forbes.com 18 April 2011 ~~

Escalating tensions over a proposal to impose rolling outages on wind-power farms in Oregon and Washington State to prevent the electric grid from overheating has convinced the Bonneville Power Administration (BPA), which is responsible for operating the power grid in the Pacific Northwest, to pull the plug on the plan.

This leaves the BPA with a whole new set of problems as it grapples with the prospect of excess hydropower resulting from an abnormally abundant snowpack in the region this year. In particular, the BPA has yet to offer a viable alternative to the rolling wind outages strategy, which would have ensured the grid complied with federally mandated reliability standards and protected salmon populations from the anticipated flood of freshwater.

“This is going to be a major issue for the region,” said John Saven, CEO of the Northwest Requirements Utilities, a trade group representing public utilities that buy power from BPA, in an interview with The Oregonian. “We’re in the first inning.”

In hardly half a decade, the BPA has scrambled to accommodate more than 3,000 megawatts of new wind capacity, most of which has been developed by California utilities seeking to meet their requirements under California law to produce one-third of the state’s electricity from renewable energy by 2020.

The BPA continues to express concerns that wind operators will force it to reserve a greater percentage of its hydro generation as backup reserves and could ultimately compromise operations if too much water builds up.

Source:  William Pentland, Clean Beta, blogs.forbes.com 18 April 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon