LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Construction on 427-foot turbine halted 

Credit:  By Samantha Turner, North Kingstown Patch, northkingstown.patch.com 12 April 2011 ~~

The Town of North Kingstown revoked the building permit for North Kingstown Green last week, ostensibly halting construction on a 427-foot wind turbine at one of the development’s homes.

According to Town Manager Michael Embury, the permit was revoked after the town solicitor’s office found that a required lot swap at the subdivision had not occurred and, therefore, the subdivision requirements were not completed. The oversight, according to Embury, was “enough to pull [the permit]” and stop construction on the turbine. Embury went on to say that the move was partially in response to residents who called for the building permit’s revocation.

“It was a deed filing between the developer and the subdivision and we missed it,” said David Darlington, spokesperson for Wind Energy Development LLC, which is installing the turbine. According to Darlington, Mark DePasquale – CEO of Wind Energy – is both the developer and head of the subdivision.

Darlington anticipates the matter will be resolved in the next few days.

Whether the revocation is a speed bump or brick wall in the process to erect the turbine remains to be seen, according to both Embury and Darlington. Embury stated there are some things that need to be looked at by the solicitor’s office.

The 427-foot turbine is currently under construction in DePasquale’s backyard. As of this date, only the base for the turbine has been dug out.

Thursday night the North Kingstown Planning Commission will hold another hearing on the application for a 389-foot turbine at Stamp Farm on South County Trail at 7 p.m. at the Beechwood Senior Center. (Read more about the Stamp Farm turbine here.)

Source:  By Samantha Turner, North Kingstown Patch, northkingstown.patch.com 12 April 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon