LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Gamesa: Test tower shows strong winds 

A test tower has shown Gamesa Energy that the winds near the Buckhorn are promising, so the company will build a taller tower at another site in the area as a preliminary to developing a wind farm.

Gamesa erected the 60-meter tower on City Authority land about a mile from Skyline Drive on the city side, and will construct an 80-meter tower at a still-undetermined site for further testing, said Ellen Lutz, director of development for Gamesa, and Alyssa Edwards, project developer.

The company hopes to build up to 30 two-megawatt turbines in and around Logan Township on Chestnut Flats south of Route 36 and east of Gallitzin-Coupon Road.

Initial results show the area is “a very good wind resource,” Edwards said.

The company would not place any turbines visible from Horseshoe Curve, she said.

In addition to testing for wind, the company studies environmental, cultural, wetlands and habitat issues before seeking approval for turbine sites, Edwards said.

To build all the turbines it wants for the Chestnut Flats project, the company would need to acquire additional land beyond the overlay zone, they said.

The turbines would be 400 feet tall with a spinning-blade pattern 286 feet in diameter.

The disturbed-area footprint, including roads, is about an acre per turbine, Gamesa officials said.

The company tentatively has agreed to pay $6,000 per turbine on a 20-year lease, authority Chairman Maurice Lawruk and solicitor Alan Krier said.

The authority agreed with Logan Township not to negotiate placement of turbines on Brush Mountain near Kettle Reservoir because the mountain is far more pristine than Chestnut Flats.

By William Kibler

Altoona Mirror

altoonamirror.com

18 May 2007

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky