LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Public consultation for Sliabh Ban plan 

Credit:  By Staff Reporter, Longford Leader, www.longfordleader.ie Published Date: 03 September 2010 ~~

On September 14 next a public consultation will take place at the Percy French Hotel, Strokestown, from 4pm to 9pm. The consultation is being organised by forestry and renewable energy company, Coillte and aims to address local concerns with regard to the proposed wind farm at Sliabh Ban.

The company has also recently met with members of the Sliabh Ban Community Group, of which Mike de Jong is a member.

“Four of us met with three of their representatives recently,” he said in a recent interview with the Longford Leader. “They advised us of the public consultation and we are pleased to have it. Our only concern is whether they will listen to us.”

Coillte have recently advised that they are reducing the number of wind turbines on the proposed farm from 25 to 21, but are increasing the height of a number of them to 131 metres.

“The final height of the turbines can only be decided when all of the data from the wind analysis is available. Coillte is still gathering information from the wind monitoring equipment installed at Sliabh Ban and it is only when all data is available that the final height of the proposed turbines can be determined,” said a spokesperson for Coillte.

In addition to this the company has addressed concerns regarding noise pollution by stating:

“One concern raised was sound that may be generated by wind turbines. In reality, any noticeable sound is absorbed over a distance of 200m to 400m from the turbine, depending on the existing background levels of noise. The design guidelines stipulate a minimum distance from nearest dwellings of 500m. However, Coillte is proposing a minimum distance of 700m from dwellings for each of the turbines at Sliabh Ban.

“In addition, the maximum number of trees will be retained on Sliabh Ban and this will further lessen any sound from the turbines,” he added.

Source:  By Staff Reporter, Longford Leader, www.longfordleader.ie Published Date: 03 September 2010

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky