LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Still no word on turbine fire cause 

Credit:  By Gerard Creces, Goderich Signal Star | Thursday, May 23, 2013 | www.goderichsignalstar.com ~~

There is still no official word from Capital Power as to the cause of an April 2 industrial wind turbine fire.

“Right after the fire we had some techs here and the root cause investigation is underway,” said site manager for Capital Power, Dan Hayden. “I think we are making some headway.”

While the investigation has brought to light some good information, he said the reports are far from complete. Capital Power is not sharing the cause just yet.

However, there is a repair plan in place already, and replacement parts for the damaged turbine have been ordered. The exact schedule depends on manufacturing and shipping the replacement parts. Because of their size, the parts will have to be shipped by train.

The work will also need to be coordinated to do the take down of old parts and reinstallation of new.

The turbine’s nacelle, which houses the generator, was severely damaged in the fire, as were all three turbine blades. Replacing the damaged parts will be much the same as the construction process, Hayden said, except from the top down instead of the ground up.

The bottom line, he said, is that investigation is underway, and replacement parts are in the process of being ordered. The repairs should be done for summer.

The turbine caught fire early in the morning of April 2, on Golf Course Road by Loyal Line. The fire department received a call about 1 a.m. and the fire burnt itself out by 3 a.m. The turbine is built so that it shuts off from the grid automatically in such an emergency.

Source:  By Gerard Creces, Goderich Signal Star | Thursday, May 23, 2013 | www.goderichsignalstar.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky