LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Vestas debuts turbines for wind farms with moderate breezes 

Credit:  By Alex Morales - 2013-04-24 | Bloomberg | www.bloomberg.com ~~

Vestas Wind Systems A/S (VWS), the turbine maker with the most installed machines, plans to sell two new devices to tap medium and low winds.

The V100 and V110 2-megawatt turbines will allow customers to exploit a wider range of sites, Aarhus, Denmark-based Vestas said today in an e-mailed statement. They’re designed to replace the V90 and V100 1.8-megawatt units, Chief Technology Officer Anders Vedel said today in a telephone interview.

“This step upwards gives a significant increase in electricity production, and doesn’t require much additional training for technicians,” Vedel said. “We can give a stronger business case for any particular wind farm.”

Vestas is 16 months into a two-year turnaround program to reduce fixed costs by 400 million euros ($520 million) and cut the workforce by 30 percent to return to profitability. Its shares have outperformed most peers this year, gaining 47 percent compared with the 23 percent increase in the 10-member BI Global Wind Energy index in the period.

The new V110 turbine will be made with a “structural shell” blade rather than one with a central spar. A blade whose shell bears the load is easier to manufacture, and can be outsourced when required, to cut down shipping costs and open up new markets, Vedel said.

“The longer the blade, the greater the challenge to produce it with a spar,” Vedel said. “The number of tools that goes into the process for a structural shell is reduced considerably.”

Serial production of the two turbines will begin in the second quarter of next year, Vestas said. A prototype of the V110 is due to be installed in Denmark in the first quarter.

Source:  By Alex Morales - 2013-04-24 | Bloomberg | www.bloomberg.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky