LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind farm shutdown as probe into accident is launched 

An investigation has been launched after the blade of a wind turbine above Llanmiloe snapped.

Fortunately, no-one was hurt in the incident at Parc Cynog at around 5pm on Sunday afternoon.

Although the blade was still attached to the turbine, debris was strews across a 10m radius around the column.

The site has five turbines standing at more than 60m, with a blade diameter of 48m.

Bosses at Nuon Renewables, which owns the site, have launched an investigation and shut down the remaining turbines.

The incident has rocked the village, where some residents are fighting to block plans to triple the output of Parc Cynog, with an additional six 80m turbines.

Protester and resident Hugh Davies, of Westmead Close, said the situation could have been much worse.

He told the Journal: “The wind farm is on the hill above Westmead Close and there is also the school here.

“That blade could have come away completely and spun down the hill, hitting the school or people’s homes.”

Llanmiloe community councillor and chair of the village residents’ association Jan Done said:

“This has rattled the village. It is lucky it happened when it did, as children were not in school, and also that the blade didn’t fly off.”

Nuon Renewables spokesman Al Hanagan said: “Engineers are currently on site investigating the circumstances and cause of the failure.

“No-one was injured as a result of the failure, and the broken blade is still attached to the hub. The turbine automatically shut down when the blade failed.

“In line with standard procedure, the other turbines at Parc Cynog have been switched off whilst the initial investigation proceeds.”

By Ian Lewis
Carmarthen Journal

28 February 2007

(courtesy of Save Our Common Mountain Environment)

socme.org

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky