LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind farm closes after blade snaps off 

Credit:  Kathy Mellott | The Tribune-Democrat | January 7, 2013 | tribune-democrat.com ~~

PORTAGE – A large part of one of the wind turbine blades at Allegheny Ridge Wind Farm broke off over the weekend, forcing the owners to shut down the operation.

The blade came off for no apparent reason, said a spokesman for Infigen Energy, which has owned the wind farm for the past several years.

High winds are one possible cause being looked at for the blade failure, but a safety investigator scheduled to arrive as early as today will look into a number of potential reasons, David Smith, vice president of Infigen’s commercial division, said Monday.

“The winds were blowing pretty good over the weekend, but we’re not operating in winds the turbines) are not graded to operate in,” Smith said.

“We think it may be a combination of things.”

The blades measure more than 140 feet long, and about two-thirds of the malfunctioning blade appears to have fallen to the ground.

Smith said the blade “fell free,” with no injuries reported and no other property damage noted.

“We have not had a lot of failures at the Allegheny Ridge site,” Smith said. “We haven’t really had too many problems with the blades.”

Ice is not uncommon on blades along the ridgetop, Smith said, but a computerized monitoring system in Dallas provides for the turbines to be shut down when ice is a factor.

The wind farm is located at one of the highest points in the region,

“We have confirmed there was no ice on it” that could have caused this failure, Smith said.

The decision to shut down the 40-turbine site was a precaution, Smith said.

“That is a standard procedure for us. We want to make sure (any problem) doesn’t manifest itself elsewhere in the farm,” he said.

Smith said the company should be able to start bringing the turbines back on line soon.

The wind farm near the Cambria-Blair county line includes 40 turbines.

The site, which became operational in 2007, stretches into Washington and Cresson townships in Cambria County and Juniata Township in Blair County.

Source:  Kathy Mellott | The Tribune-Democrat | January 7, 2013 | tribune-democrat.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon