LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind farm ‘remains a threat to the coast’ 

Credit:  20 December 2012 | www.thisisdorset.net ~~

The proposed wind farm remains “a major threat” to the Dorset coast, despite plans to move it further out to sea and have fewer turbines.

Opposition group Challenge Navitus claims public concerns remain “unanswered” and has branded the changes “a missed opportunity”.

Navitus Bay Development Ltd insists the planned changes would reduce the farm’s visual impact with the park being sited 12 miles away from Bournemouth, rather than 10, and the maximum number of turbines 218, instead of 333.

Maximum height will be 200m, instead of 210m, while the total area of the seabed affected will be reduced from 198sqkm to 175sqkm with the park’s generating capacity reduced from 1,200 megawatts to 1,100.

Project director Mike Unsworth said: “We feel that these significant adjustments to the plans strike a good balance between responses that we have had from consultees and the technical viability from an environmental, engineering, shipping and commercial perspective.”

But David Lloyd from Challenge Navitus said the changes “would only have a small effect on the impact of this huge development” and were “a missed opportunity.”

He added: “Even in its revised form, if it were built today, the wind farm would still be the biggest in the world and remain totally out of proportion in an area that is home to England’s only natural UNESCO World Heritage Site and two Areas of Outstanding Natural Beauty.”

Mr Lloyd said, at its closest point, the wind farm would still be only 8.9 miles from the coast – “well over double the apparent width of the Isle of Wight and nearly three times its apparent height. While the reductions in visibility from Bournemouth and Christchurch are welcome, a far more radical overhaul is needed.”

Source:  20 December 2012 | www.thisisdorset.net

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky