LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Hanover wind turbine will take a little longer 

Credit:  By Mark Burridge | Wicked Local Hanover | Dec 05, 2012 | www.wickedlocal.com ~~

Hanover will have to wait a little longer on its wind turbine after a test rotation of the blades revealed a few problems.

“The pressure switch at the tip end of the blades has been replaced,” said Victor Diniak, director of the Department of Public Works. “Part of the control system which regulates the quality of the power [needed to be replaced as well and the part] arrived today (Dec. 3).”

With the last of the problematic components either replaced or soon to be replaced, the long awaited turbine could be up and running soon.

Selectmen chairman John Barry was concerned if the town would be offered any kind of warranty by the builders given the issues the town has already dealt with.

“I think we’ve been an agreeable customer through all these hiccups,” he said. “I’d like to think there could be an extended warranty.”

Diniak noted the unusual nature of the project in general. He said the turbine had been constructed in India, tested, disassembled and sent to Hanover.

“It is a complicated process, one of the hardest projects I’ve been a part of,” Diniak said. “But we can certainly pursue [the warranty].”

Selectman Joseph Salvucci was concerned given the custom nature of the design of the turbine and the fact it came from India. If something broke, it may be hard to replace, he said. However, Diniak said part replacement, save for a few components wouldn’t be hard to find.

“There are not custom manufactured parts,” he said.

For now, the town is forced to wait a little longer, although it appears the project could soon be concluded.

Source:  By Mark Burridge | Wicked Local Hanover | Dec 05, 2012 | www.wickedlocal.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon