LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Experts to inspect Portsmouth’s ailing turbine 

Credit:  By Jill Rodrigues | www.eastbayri.com 21 August 2012 ~~

PORTSMOUTH – With higher estimates for fixing the town’s wind turbine now running at over $700,000, the town council hopes to hear better news from having an inspection of the broken part and looking into possible private partnerships.

Experts will soon conduct an on-site inspection of the failed gearbox to try to determine what caused the turbine’s failure, Town Administrator John Klimm reported to the council at last week’s meeting. Since the cause of the failure is unknown, this may help pinpoint exactly what is wrong with the turbine before committing to costly repairs.

Mr. Klimm has also been consulting with two people who own and operate the same AAER 1.5 MW turbine, one of which has had the same gearbox problem.

Two estimates for repairing the turbine, about $100,000 higher than the estimates presented a month ago, were given to the council last week. If the gearbox can be replaced in the air the whole project – parts and labor – will cost $671,678, and if it all must be taken to the ground it will cost $703,362.

Lumus, the turbine maintenance provider, has recommended replacing the gearbox at the same time the failed gearbox is removed so the town doesn’t double up on project costs such as an estimated $59,000 to $130,000 to bring in a crane for one day.

Since the town’s issue with the turbine has been in the news, Mr. Klimm has received several phone calls expressing interest in a private-sector partnership of the turbine. This week the town will advertise a request for qualifications and information to see what kind of partnerships will be proposed.

Councilors decided to wait on a decision to have the maintenance contractor repair the turbine until they have received the inspection report in the next few weeks.

Source:  By Jill Rodrigues | www.eastbayri.com 21 August 2012

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon