LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

What’s preventing new wind turbine from spinning 

Credit:  By Sandy McGee, Portsmouth Patch, portsmouth.patch.com 20 March 2012 ~~

It’s been more than two months since construction on the Hodges Badge wind turbine was completed, and yet the turbine is still not turning.

What’s the hold up?

Rick Hodges, owner of the Hodges Badge company, says they are waiting on certificates and approval from National Grid before turning on the turbine. Hodges writes about the process in the following e-mail:

We are getting very close. National Grid says that we should have their letter some time next week stating that we have met all of their conditions to connect to the grid. The other thing we are waiting from is a welding certification (which has to come from the tower manufacturer in India) and should also be here next week.

When we have both of those, we can finish the installation and turn it on! We are trying to get the technician here next week, but that will only happen if the other turbine he’s working on gets done by then, otherwise it will be a few days longer.

Following the commissioning of the turbine and acceptance by National Grid, the turbine will become the third in operation in Portsmouth, and the fourth on Aquidneck Island. In Portsmouth, a turbine is already located at Portsmouth High School and another stands erected at Portsmouth Abbey.

Able to generate power at a wind speed of just nine miles per hour, the turbine is expected to cover the electrical needs of Hodges’ entire manufacturing operation.

Source:  By Sandy McGee, Portsmouth Patch, portsmouth.patch.com 20 March 2012

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky