Wind Watch is a registered educational charity, founded in 2005. |
Selectmen consider wind turbine feasibility study
Credit: By Ashleigh Bennett, Wicked Local, www.wickedlocal.com 17 April 2012 ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
WAREHAM – The Wareham Water Pollution Control Facility may be the future site of a wind turbine, which would stand at around 65-80 meters tall. The Selectmen passed a motion agreeing to file a request for a feasibility study looking into this project. This way, if the wind turbine bylaws change at Town Meeting, the project already is filed with the town.
The feasibility study would give the town information and answers about the project before the town decides to take on that risk or not.
Wareham received a grant from Mass CEC looking into the idea, and recently the Water Pollution Control Facility completed a yearlong study with Atlantic Design Engineers Inc., where they collected wind resource data from the potential site, and from surrounding communities who use turbines.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Funding |
(via Stripe) |
(via Paypal) |
Share: