LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

News Watch Home

Pugwash residents call for environmental assessment to be suspended 

Credit:  CNW, www.newswire.ca 15 February 2012 ~~

The Gulf Shore Preservation Association sent a letter to the Minister of Environment calling on him to suspend the public comment period for the ‘Pugwash Wind Farm Environmental Assessment’ until the proponent has completed the studies necessary for an Environmental Assessment to be deemed complete.

Richard Gray wrote for the association, “It is surprising that this document has been deemed complete and acceptable by your Ministry, but we expect upon further review of these items you will see fit to suspend the comment period on the Pugwash Wind Farm Environmental Assessment until the proponent has completed the work necessary…”

The proponent wants to install five wind turbines in areas the proponent describes as ‘wet forest or wetlands’, which is a clear contravention of Nova Scotia’s Provincial Wetland Conservation Policy.

The document has been reviewed by a number of members of the community and experts who have found the following deficiencies:

1) Proponent has not determined the number of turbines they plan to install (pg 3).

2) The manufacturer or model of turbines has not been determined (pg 12). It is impossible for the proponent to provide accurate noise assessments, shadow flicker assessments or to describe the physical construction requirements for the turbine bases without this information (pg 12).

3) Access road to ‘WTG 2’ is not finalized (pg 99).

4) Electrical cabling route is not finalized (pg 4).

5) Archeological studies are not complete (pg 99).

6) Geotechnical studies have not been completed (pg13).

7) Turbines 4 and 12 are proposed to be installed IN wetlands (pg 42).

8) Turbines 2, 3, Alt-4, and 7 are located in ‘wet forest or wetland’ (pg 40).

9) The ‘winter bird monitoring’ is not complete. Results expected after March 2012 (pg 27).

10) The bat study was completed outside the project zone and the methodology used made it impossible to record bats at heights over 40 metres (pg 52). The proposed wind turbines are up to 157 metres tall (pg 12).

11) Plans to transport wind turbine components to the project site are not complete (pg 14).

12) No first nations consultations have been completed and the Mi’kmaq Ecological Knowledge study is expected to be completed in spring 2012 (pg 30).

13) Based on local knowledge a number of breeding birds and mammals known to exist within the project area were omitted by the proponent (pg 45 and 50).

14) ‘Consideration is being given’ to building a permanent structure within the project zone. No detail on scale or location provided(pg 15).

15) No Decommissioning plan has been completed (pg 16).

16) Erosion and sediment control plans do not yet exist (pg 18).

17) No EPP (Environmental Protection Plan) has been developed (pg 20).

An electronic copy of the Environmental Assessment is available on the Department of Environment’s website at http://www.gov.ns.ca/nse/ea/pugwash.wind.farm.asp

A copy of the GSPA letter to Minister Belliveau is available on request.
For further information:

Dick Gray
Gulf Shore Preservation Association
902 243 3105

Source:  CNW, www.newswire.ca 15 February 2012

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon