LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind Turbine Company Files Appeal With PSC 

Synergics Wind Energy is appealing the Oct. 30 decision made by hearing examiner David L. Moore, Maryland Public Service Commission. The examiner had approved the company’s application to build wind turbines in Garrett County, but with several environmental restrictions.

At the October hearing, Moore okayed 24 conditions recommended by the Department of Natural Resources, including one that would prevent construction of the wind turbines in two areas in order to help preserve habitat for rare species.

Synergics had until Nov. 30 to appeal the examiner’s decision to the full Maryland Public Service Commission. The company filed its appeal yesterday, Nov. 29. Oakland resident Jon Boone, Friends of Backbone Mountain, is also appealing Moore’s decision. Boone filed his appeal on Monday, Nov. 27. Hearing dates have not yet been set.

The Annapolis based company’s construction plans include 17 wind turbines, up to 548 feet tall (measured from a blade at its highest point), along a 3-mile length of Backbone Mountain near Roth Rock. Synergics had originally planned to build 24 turbines measuring 387 feet.

The company reduced the number of turbines after the DNR identified several rare species in the proposed project area. Those include the mourning warbler, mountain wood fern, summer sedge, Allegheny woodrat, and timber rattlesnake. The height of the proposed structures was subsequently increased to compensate for the loss of power from fewer turbines.

Synergics contends that the turbines will generate 40 megawatts of electricity, which will be sold on the wholesale power market, and help the state meet its goal of producing 7.5 percent of electricity from renewable resources by the year 2017.

therepublicannews.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky