LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]




Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Winds of war 

Credit:  Posted by Mark Thompson, battleland.blogs.time.com 6 October 2011 ~~

Apparently the Navy isn’t the only service that has trouble building projects with money from 2009’s American Recovery and Reinvestment Act. The Air Force planned on spending $15 million for three wind turbines to generate electric power for remote Alaskan radar sites. Sure, there have been the typical problems: each turbine’s cost has risen by $1 million.

But the real killer is the lack of planning done to ensure that the turbines make economic sense – the same problem the Navy had. One reason may be the Air Force’s incredibly-flawed test program to see if such turbines make sense in the first place.

In 2002, the Air Force studied possible sites for a pilot project. In 2007, they signed a $2 million contract to build a prototype at Tin City, Alaska, an isolated radar station located 700 miles northeast of Anchorage on the western-most tip of North America (yes, on a clear day you can see Russia).

The turbine was finished in October 2008. However, the Pentagon inspector general says in a new report, it isn’t generating any power. Why, curious taxpayers might want to know:

Completing a wind study would have provided [Air Force] personnel the information necessary to determine the most advantageous location at which to build the turbine. Because [Air Force] personnel did not complete a wind study at Tin City before construction, the turbine is located in an area with turbulent winds, and therefore, according to [Air Force] personnel, produces sporadic, unusable power.

Wind studies for the three new turbines weren’t completed before work began on them, either.

Source:  Posted by Mark Thompson, battleland.blogs.time.com 6 October 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky